Go from one side of the dam of the October bridge in Novosibirsk to another is now possible via the tunnel under the road. While this option really only available to builders. But by mid-2022 there should be a system of subways and elevators, with the future station “Sports” can be directly to get to the other side of the dam. Today it held the first mayor of Novosibirsk Anatoly Elbow, which made the company and correspondent NGS.
the Tunnel under the roadway through a dam of the October bridge began to build in the winter. Now you can not just walk, but even to drive a small car. According to designers, it will become part of a whole system of pedestrian crossings that will connect the left and right side of the dam.